Skip to content
LOS Analyzer

Rig · 2026

Truck Mounted Drill Rig 8

Dillingham, AK · near Dillingham (0.5 mi)

Determination of no hazardDetermined - No Hazard20 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"The City of Dillingham Airport Waterline Extension project involves advancing 34 soil borings located on and off the Dillingham Airport using a truck mounted drill rig. The drill rig will be temporarily located on and off the Dillingham airport during drilling. Drilling is anticipated to take up to 12 days depending on weather. Drilling is anticipated to occur between March and September. The drill rig mast height is approximately 20 feet. The mast will be lowered when not in use. Lats/Longs are boring locations."

Filing details

Case number (ASN)
2026-AAL-37-OE
Structure
Truck Mounted Drill Rig 8
Type
Rig
Category
Rig
Height above ground
20 ft
Height above sea level
89 ft
Site elevation
69 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 13, 2026
Determined
January 27, 2026
Determination expires
July 27, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Shannon AND Wilson, INC.
Representative
Shannon AND Wilson, INC.

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Shannon AND Wilson, INC. →

Location

Coordinates
59.043689, -158.492019
Degrees / minutes / seconds
59°02'37.3"N 158°29'31.3"W
County
Dillingham

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Dillingham →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.