Skip to content
LOS Analyzer

Rig · 2026

DPT

Davenport, IA · near Davenport Muni (0.5 mi)

Returned to proponentDetermined - No Hazard35 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Drilling work includes the installation of groundwater monitoring wells within the Drilling Area polygon. Drilling Area shown on the map includes the entire potential area of equipment and work extents. This includes ground movements support and drilling. Actual drilling locations will be an individual point within the drilling area. Proposed well locations are shown but actual locations will be determined based on subsurface conditions. Drilling at each location will typically be completed in less than two days."

Filing details

Case number (ASN)
2026-ACE-3418-NRA
Structure
DPT
Type
Rig / drilling
Category
Rig
Height above ground
35 ft
Height above sea level
783 ft
Site elevation
748 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
June 16, 2026
Determined
July 14, 2026
Determination expires
January 14, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
ARMY National Guard
Representative
ARMY National Guard

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by ARMY National Guard →

Location

Coordinates
41.616831, -90.582886
Degrees / minutes / seconds
41°37'00.6"N 90°34'58.4"W
County
Scott

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Davenport Muni →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.