Skip to content
LOS Analyzer

Crane · 2026

AT&T FA 12926727 \Saratoga Airport\""

Ballston Spa, NY · near Saratoga County (0.7 mi)

Preliminary findingsPending145 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Crane required to replace aging AT&T equipment on the EXISTING 125' tall monopole cell tower"

Filing details

Case number (ASN)
2026-AEA-3258-OE
Structure
AT&T FA 12926727 \Saratoga Airport\""
Type
Crane
Category
Crane
Height above ground
145 ft
Height above sea level
567 ft
Site elevation
422 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 10, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
LA Grange Crane
Representative
La Grange Crane

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by LA Grange Crane →

Location

Coordinates
43.055908, -73.849403
Degrees / minutes / seconds
43°03'21.3"N 73°50'57.9"W
County
Saratoga

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.