Skip to content
LOS Analyzer

Construction equipment · 2026

N89 AWOS WA2 New Site pt-1

Ellenville, NY · near Joseph Y Resnick (0.0 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This airspace case is for the temporary construction equipment necessary for the reconstruction of weather reporting equipment project within the construction envelope of Work Area 2 at Joseph Y. Resnick Airport in Wawarsing New York. Anticipated equipment height not to exceed 20 feet. Work within this work area includes installation of the new AWOS III P/T utility trenching and tree clearing. Contractor is to coordinate with airport and RPR prior to access Work Area 2."

Filing details

Case number (ASN)
2026-AEA-36-NRA
Structure
N89 AWOS WA2 New Site pt-1
Type
Construction / other
Category
Construction equipment
Height above ground
20 ft
Height above sea level
303 ft
Site elevation
283 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 5, 2026
Determined
January 22, 2026
Determination expires
July 22, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
TOWN OF Wawarsing
Representative
Passero Associates

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by TOWN OF Wawarsing →

Location

Coordinates
41.729011, -74.376131
Degrees / minutes / seconds
41°43'44.4"N 74°22'34.1"W
County
Ulster

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Joseph Y Resnick →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.