Skip to content
LOS Analyzer

Construction equipment · 2026

Construction limits for ROA PAPI project

Roanoke, VA · near Roanoke/Blacksburg Rgnl (Woodrum Fld) (0.3 mi)

Returned to proponentDetermined - No Hazard10 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"These are the coordinates for the construction area used for the RWY 06 PAPI project"

Filing details

Case number (ASN)
2026-AEA-491-NRA
Structure
Construction limits for ROA PAPI project
Type
Construction / vehicle
Category
Construction equipment
Height above ground
10 ft
Height above sea level
1,167 ft
Site elevation
1,157 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 11, 2026
Determined
April 16, 2026
Determination expires
October 2, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Federal Aviation Adminstration
Representative
Federal Aviation Adminstration

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Federal Aviation Adminstration →

Location

Coordinates
37.323811, -79.981072
Degrees / minutes / seconds
37°19'25.7"N 79°58'51.9"W
County
Roanoke

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Roanoke/Blacksburg Rgnl (Woodrum Fld) →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.