Building · 2026
ARFF Building
Iron Mountain, MI · near Ford (0.3 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"New ARFF Building. Building height lowered by 18\ and building location shifted slightly based on field survey of existing building. The building corners closest to Runway 13-31 and penetrating the Part 77 Transitional Surface (B3 and B4) will be lighted with red obstruction lights.""
Filing details
- Case number (ASN)
- 2026-AGL-11917-NRA
- Structure
- ARFF Building
- Type
- Building
- Category
- Building
- Height above ground
- 24 ft
- Height above sea level
- 1,155 ft
- Site elevation
- 1,131 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- July 8, 2026
- Determined
- August 25, 2026
- Determination expires
- February 25, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Ford Airport
- Representative
- Prein&Newhof
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 45.817519, -88.120114
- Degrees / minutes / seconds
- 45°49'03.1"N 88°07'12.4"W
- County
- Dickinson
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Ford →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.