Skip to content
LOS Analyzer

Construction equipment · 2026

TEMPROC2

Elk Grove Village, IL · near Chicago O'Hare Intl (2.6 mi)

Determination of no hazardDetermined - No Hazard54 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Roadway reconstruction of Touhy Ave between Elmhurst Rd and Mount Prospect Rd in Elk Grove Village. The major feature of the project consists of grade separation of Touhy Ave via construction of two new bridges that will carry Touhy over UP railroad and future EOWA (I-490) Tollway corridor."

Filing details

Case number (ASN)
2026-AGL-2590-OE
Structure
TEMPROC2
Type
Construction / other
Category
Construction equipment
Height above ground
54 ft
Height above sea level
715 ft
Site elevation
661 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
February 6, 2026
Determined
February 11, 2026
Determination expires
August 11, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Illinois Tollway
Representative
EOWA CCM

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Illinois Tollway →

Location

Coordinates
42.008350, -87.935569
Degrees / minutes / seconds
42°00'30.1"N 87°56'08.0"W
County
Cook

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Chicago O'Hare Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.