Skip to content
LOS Analyzer

Building · 2026

415 Rivoli Circle

St Paul, MN · near St Paul Downtown Holman Fld (2.1 mi)

Marking and lightingRevision25 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"We propose to build a wood framed single family home as part of a 9 house development on this site."

Filing details

Case number (ASN)
2026-AGL-5948-OE
Structure
415 Rivoli Circle
Type
Building
Category
Building
Height above ground
25 ft
Height above sea level
859 ft
Site elevation
834 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
April 15, 2026
Determined
July 27, 2026
Determination expires
January 8, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Dayton's Bluff Neighborhood Housing Services
Representative
Alan Crenshaw

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Dayton's Bluff Neighborhood Housing Services →

Location

Coordinates
44.960606, -93.083025
Degrees / minutes / seconds
44°57'38.2"N 93°04'58.9"W
County
Ramsey

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near St Paul Downtown Holman Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.