Skip to content
LOS Analyzer

Solar · 2026

146935 - Leeds Renewables

Leeds, ME · near Bowman Fld (5.6 mi)

Determination of no hazardDetermined - No Hazard20 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Ground-mounted solar photovoltaic facility"

Filing details

Case number (ASN)
2026-ANE-1496-OE
Structure
146935 - Leeds Renewables
Type
Electrical_system / solar_panel
Category
Solar
Height above ground
20 ft
Height above sea level
481 ft
Site elevation
461 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 2, 2026
Determined
June 15, 2026
Determination expires
—

Who filed it

Sponsor
NEXAMP - Barrett
Representative
Barrett Energy Resources Group, LLC

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
44.331483, -70.120761
Degrees / minutes / seconds
44°19'53.3"N 70°07'14.7"W
County
Androscoggin

See every 2026 filing near Bowman Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.