Skip to content
LOS Analyzer

Crane · 2026

90 ton Crane

Londonderry, NH · near Manchester Boston Rgnl (0.2 mi)

Returned to proponentDetermined - No Hazard60 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Proposing to use a 90-ton crane approximately 60ft tall. To set two electrical manholes which are approximately 55 000.00 pounds in weight. The hole for these will be previously dug and crane will be staged so that it can be lifted off the delivery truck and into the hole. We expect each lift and placement to take 1 hour or less."

Filing details

Case number (ASN)
2026-ANE-584-NRA
Structure
90 ton Crane
Type
Crane
Category
Crane
Height above ground
60 ft
Height above sea level
291 ft
Site elevation
231 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 10, 2026
Determined
June 22, 2026
Determination expires
December 22, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Moulison Electric, Inc.
Representative
Zachary Johnson

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
42.931994, -71.432858
Degrees / minutes / seconds
42°55'55.2"N 71°25'58.3"W
County
Rockingham

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Manchester Boston Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.