Skip to content
LOS Analyzer

Power line · 2026

813

Stratford, CT · near Sikorsky (1.4 mi)

Marking and lightingFinal203 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"Construction of 115 kV transmission line structures."

Filing details

Case number (ASN)
2026-ANE-793-OE
Structure
813
Type
Transmission_line / t_l_tower
Category
Power line
Height above ground
203 ft
Height above sea level
207 ft
Site elevation
4 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
—

Timeline

Filed
March 18, 2026
Determined
June 10, 2026
Determination expires
—

Who filed it

Sponsor
Eversource - RS
Representative
Clyde Pittman

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
41.229219, -73.107739
Degrees / minutes / seconds
41°13'45.2"N 73°06'27.9"W
County
New Haven

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Sikorsky →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.