Skip to content
LOS Analyzer

Building · 2026

Kaiser Permanente Sunnyside Medical Center

Clackamas, OR · near Camp Withycombe Ahp (1.3 mi)

Determination of no hazardDetermined - No Hazard130 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"7 Story Hospital"

Filing details

Case number (ASN)
2026-ANM-3711-OE
Structure
Kaiser Permanente Sunnyside Medical Center
Type
Building
Category
Building
Height above ground
130 ft
Height above sea level
415 ft
Site elevation
285 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
May 21, 2026
Determined
July 8, 2026
Determination expires
January 8, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Kaiser Permanente
Representative
Clint Knaggs

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
45.433064, -122.558917
Degrees / minutes / seconds
45°25'59.0"N 122°33'32.1"W
County
Clackamas

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.