Skip to content
LOS Analyzer

Antenna tower · 2026

KFCT TOWER Pierce CO

Fort Collins, CO · near Northern Colorado Rgnl (16.6 mi)

Marking and lightingRevision738 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"The requested change is to bring to the current lighting circular 70/7460-1M Obstruction Marking and Lighting an Avian “A” style system - Chapters 3 4 5 &15."

Filing details

Case number (ASN)
2026-ANM-3731-OE
Structure
KFCT TOWER Pierce CO
Type
Tower / antenna
Category
Antenna tower
Height above ground
738 ft
Height above sea level
5,988 ft
Site elevation
5,250 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Red lights and paint

Timeline

Filed
May 26, 2026
Determined
June 5, 2026
Determination expires
—

Who filed it

Sponsor
Nexstar Media Group
Representative
Kevin Bethke

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
40.642083, -104.818472
Degrees / minutes / seconds
40°38'31.5"N 104°49'06.5"W
County
Weld

See every 2026 filing near Northern Colorado Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.