Construction equipment · 2026

Seal Coat and Marking Phase 1-10

Cheyenne, WY · near Cheyenne Rgnl/Jerry Olson Fld (0.3 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The maximum equipment height is 20 feet. \nThe contractor will only close one taxiway at a time when working on Phase 1 areas outside the RSAs.\nThe construction duration for Phase 1 including subphases 1A-1C is 14 days; however the contractor will determine the dates that this will be completed."

Filing details

Case number (ASN)
2026-ANM-747-NRA
Structure
Seal Coat and Marking Phase 1-10
Type
Construction / other
Category
Construction equipment
Height above ground
20 ft
Height above sea level
6,158 ft
Site elevation
6,138 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
March 19, 2026
Determined
July 30, 2026
Determination expires
January 30, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Cheyenne Regional Airport
Representative
Tripp FOX

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Cheyenne Regional Airport →

Location

Coordinates
41.155722, -104.816125
Degrees / minutes / seconds
41°09'20.6"N 104°48'58.0"W
County
Laramie

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Cheyenne Rgnl/Jerry Olson Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.