Skip to content
LOS Analyzer

Crane · 2026

Crane_107

ATLANTA, GA · near Hartsfield/Jackson Atlanta Intl (4.1 mi)

Determination of no hazardDetermined - No Hazard145 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Crane used for Installation of 17 new transmission poles for 115kV line rebuild. There are 119 structures being installed but only 6 triggered the NCT. Additional 17 cranes will be submitted separately. OHara – Riverdale 115kV Rebuild_1437609"

Filing details

Case number (ASN)
2026-ASO-12559-OE
Structure
Crane_107
Type
Crane
Category
Crane
Height above ground
145 ft
Height above sea level
1,084 ft
Site elevation
939 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
June 22, 2026
Determined
June 30, 2026
Determination expires
December 30, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Georgia Power Co
Representative
Caitlin Russell

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Georgia Power Co →

Location

Coordinates
33.577681, -84.414725
Degrees / minutes / seconds
33°34'39.7"N 84°24'53.0"W
County
Clayton

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Hartsfield/Jackson Atlanta Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.