Antenna tower · 2026
Parkwood Tie
Durham, NC · near Raleigh-Durham Intl (7.9 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"260ft self-supporting tower with a maximum height of 270ft to allow for lightning protection. Previous ASN 2022-ASO-38695-OE had a maximum height of 315ft but lowering the height is requested to match the local zoning approval"
Filing details
- Case number (ASN)
- 2026-ASO-13473-OE
- Structure
- Parkwood Tie
- Type
- Tower / antenna
- Category
- Antenna tower
- Height above ground
- 270 ft
- Height above sea level
- 561 ft
- Site elevation
- 291 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- Dual-red and medium intensity
Timeline
- Filed
- July 8, 2026
- Determined
- August 11, 2026
- Determination expires
- February 11, 2028
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DUKE Energy Business Services, LLC
- Representative
- DUKE Energy Business Services, LLC
Names are shown as they appear in the FAA's public record. How we handle names
See every 2026 filing by DUKE Energy Business Services, LLC →
Location
- Coordinates
- 35.872056, -78.928917
- Degrees / minutes / seconds
- 35°52'19.4"N 78°55'44.1"W
- County
- Durham
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Raleigh-Durham Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.