Skip to content
LOS Analyzer

Antenna tower · 2026

GA-01238 Miller Cove

Blairsville, GA · near Blairsville (2.4 mi)

No determination recordedPublic Comment199 ft AGL

What this outcome means

No determination is recorded on this case in the FAA's published archive. Cases still under study show no determination until the aeronautical study closes.

The proposal, in the filer's words

"Proposed 195' Self support tower with a 4' rod for an overall height of 199'"

Filing details

Case number (ASN)
2026-ASO-13782-OE
Structure
GA-01238 Miller Cove
Type
Tower / antenna
Category
Antenna tower
Height above ground
199 ft
Height above sea level
2,242 ft
Site elevation
2,043 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
July 14, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
Skyway Towers, LLC
Representative
Skyway Towers, LLC

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Skyway Towers, LLC →

Location

Coordinates
34.820900, -83.988331
Degrees / minutes / seconds
34°49'15.2"N 83°59'18.0"W
County
Union

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.