Skip to content
LOS Analyzer

Construction equipment · 2026

Taxilane 2 Widening Ph1 & GA Apron Recon

Greer, SC · near Greenville Spartanburg Intl (0.3 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"The project work consists of widening the southern section Taxilane 2 (from T/W L4 to T/W L5) and reconstructing the southern section of the G/A apron with new 12” PCC pavement construction of a dry storm water detention pond and the installation of new taxiway edge lighting.\nHeight of Equipment: Construction equipment 25'\nNorthern portion of work construction vehicles only height of 20'."

Filing details

Case number (ASN)
2026-ASO-1618-NRA
Structure
Taxilane 2 Widening Ph1 & GA Apron Recon
Type
Construction / vehicle
Category
Construction equipment
Height above ground
25 ft
Height above sea level
979 ft
Site elevation
954 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
March 10, 2026
Determined
June 11, 2026
Determination expires
December 11, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Greenville–Spartanburg International Airport
Representative
Avcon, INC.

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
34.897606, -82.214672
Degrees / minutes / seconds
34°53'51.4"N 82°12'52.8"W
County
Spartanburg

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Greenville Spartanburg Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.