Skip to content
LOS Analyzer

Construction equipment · 2026

Staging and Storage Area Corner No. 5

Greenville, SC · near Greenville Downtown (0.3 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Limits of Construction for the SE Ramp Improvements Project at GMU. SE Ramp Improvements Project includes pavement reconstruction and expansion and new vehicle parking lot and new hangar and fencing and new landscaping"

Filing details

Case number (ASN)
2026-ASO-3998-NRA
Structure
Staging and Storage Area Corner No. 5
Type
Construction / other
Category
Construction equipment
Height above ground
20 ft
Height above sea level
1,017 ft
Site elevation
997 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 12, 2026
Determined
July 20, 2026
Determination expires
January 20, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Greenville Downtown Airport
Representative
Holt Consulting Co.

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Greenville Downtown Airport →

Location

Coordinates
34.844214, -82.346167
Degrees / minutes / seconds
34°50'39.2"N 82°20'46.2"W
County
Greenville

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Greenville Downtown →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.