Skip to content
LOS Analyzer

Other · 2026

Beta SDF Electric A/C Charging Station

Louisville, KY · near Louisville Muhammad Ali Intl (0.9 mi)

Returned to proponentDetermined - No Hazard10 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This submission is for the review of the CD100 plan set and the associated ALP Pen and Ink update. Proposed Electric Aircraft Charging Station and Supporting Equipment including a 320KW Charge Cube Thermal Management System Cube MTA Chiller Unit BETA Power Tower Electrical Switchboard Pad Mounted Utility Transformer and Bollards at SDF. Proposed installation of electric aircraft charging station adjacent to Hangar 5 located on airport property at SDF northeast of the airfield. The nearest runway end is Runway 17L."

Filing details

Case number (ASN)
2026-ASO-4509-NRA
Structure
Beta SDF Electric A/C Charging Station
Type
Other
Category
Other
Height above ground
10 ft
Height above sea level
505 ft
Site elevation
495 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
June 5, 2026
Determined
August 11, 2026
Determination expires
February 11, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
BETA Technologies
Representative
Kimley-Horn

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by BETA Technologies →

Location

Coordinates
38.182031, -85.723764
Degrees / minutes / seconds
38°10'55.3"N 85°43'25.6"W
County
Jefferson

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Louisville Muhammad Ali Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.