Skip to content
LOS Analyzer

Antenna tower · 2026

Franklin Operations Center

Franklin, NC · near Angel Medical Center (2.6 mi)

Preliminary findingsPending320 ft AGL

What this outcome means

An interim result issued while the aeronautical study continues. It is not the final determination.

The proposal, in the filer's words

"Duke Energy 300ft telecommunications tower with an overall height of 320ft for highest appurtenance. This filing is to refresh the previous ASN (2024-ASO-15848-OE) at the exact location. The previous ASN expired"

Filing details

Case number (ASN)
2026-ASO-5090-OE
Structure
Franklin Operations Center
Type
Tower / antenna
Category
Antenna tower
Height above ground
320 ft
Height above sea level
2,510 ft
Site elevation
2,190 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
March 5, 2026
Determined
—
Determination expires
—

Who filed it

Sponsor
DUKE Energy Business Services, LLC
Representative
DUKE Energy Business Services, LLC

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by DUKE Energy Business Services, LLC →

Location

Coordinates
35.215767, -83.353500
Degrees / minutes / seconds
35°12'56.8"N 83°21'12.6"W
County
Macon

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.