Skip to content
LOS Analyzer

Building · 2026

USC Sumter St Residence

Columbia, SC · near Jim Hamilton L B Owens (2.5 mi)

Determination of no hazardDetermined - No Hazard97 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Construction of a 7 story dormitory with roof mounted HVAC equipment and two stair towers that access the roof. Total structure heights given are to top of stair towers which are the tallest portion of the construction. The building exterior will be a mixture of brick limestone block and curtainwall glass with a TPO white roof. Construction is to begin July 2026 and be completed June 2028. The SC Aeronautics Commission has given conditional compatibility approval and requires that the project be checked for requirement of notice by the FAA. Notice was required by pre-screen check on the FAA website."

Filing details

Case number (ASN)
2026-ASO-6277-OE
Structure
USC Sumter St Residence
Type
Building / multi_unit
Category
Building
Height above ground
97 ft
Height above sea level
391 ft
Site elevation
294 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
Red lights

Timeline

Filed
March 24, 2026
Determined
May 19, 2026
Determination expires
November 19, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
University of South Carolina
Representative
Justin Abrams

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
33.994244, -81.027047
Degrees / minutes / seconds
33°59'39.3"N 81°01'37.4"W
County
Richland

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Jim Hamilton L B Owens →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.