Crane · 2026
RDU Operations Center Chiller Replacement
Morrisville, NC · near Raleigh-Durham Intl (0.5 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"A crane will be used for replacement of the chiller that serves the RDU Operations Center. The existing chiller will be hoisted out of its location and placed on a flatbed trailer for disposal and the new chiller will be hoisted into place for installation."
Filing details
- Case number (ASN)
- 2026-ASO-639-NRA
- Structure
- RDU Operations Center Chiller Replacement
- Type
- Crane
- Category
- Crane
- Height above ground
- 90 ft
- Height above sea level
- 462 ft
- Site elevation
- 372 ft
- Notice of
- New Construction
- Duration
- Temporary
- Marking & lighting
- —
Timeline
- Filed
- January 30, 2026
- Determined
- February 26, 2026
- Determination expires
- August 26, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Raleigh-Durham Airport Authority
- Representative
- Raleigh-Durham Airport Authority
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 35.873632, -78.795901
- Degrees / minutes / seconds
- 35°52'25.1"N 78°47'45.2"W
- County
- Wake
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Raleigh-Durham Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.