Skip to content
LOS Analyzer

Antenna tower · 2026

Little River

ZEBULON, NC · near Raleigh East (5.7 mi)

Marking and lightingRevision500 ft AGL

What this outcome means

The outcome turns on marking and lighting conditions — typically obstruction lighting or paint required as a condition of the determination.

The proposal, in the filer's words

"The requested change is to bring to the current lighting circular 70/7460-1M Obstruction Marking and Lighting a med-dual system - Chapters 4 8(M- Dual) &15.”"

Filing details

Case number (ASN)
2026-ASO-993-OE
Structure
Little River
Type
Tower
Category
Antenna tower
Height above ground
500 ft
Height above sea level
795 ft
Site elevation
295 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
January 15, 2026
Determined
January 23, 2026
Determination expires
—

Who filed it

Sponsor
Wake County Government NC
Representative
Kevin Bethke

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
35.844047, -78.353886
Degrees / minutes / seconds
35°50'38.6"N 78°21'14.0"W
County
Wake

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.