Skip to content
LOS Analyzer

Antenna tower · 2026

FA 10118336 - LA - White Lake PCS

Grand Chenier, LA · near Le Gros Meml (33.5 mi)

Determination of no hazardDetermined - No Hazard330 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Updating FAA ASN 2012-ASW-3629-OE to add 600 MHz CBand and DoD. Not requesting any changes to the tower's overall height or the marking and lighting. Please keep it as dual-red and medium intensity white."

Filing details

Case number (ASN)
2026-ASW-13306-OE
Structure
FA 10118336 - LA - White Lake PCS
Type
Tower / antenna
Category
Antenna tower
Height above ground
330 ft
Height above sea level
333 ft
Site elevation
3 ft
Notice of
Existing
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
August 12, 2026
Determined
August 19, 2026
Determination expires
—

Who filed it

Sponsor
AT&T
Representative
AT&T

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by AT&T →

Location

Coordinates
29.704528, -92.676139
Degrees / minutes / seconds
29°42'16.3"N 92°40'34.1"W
County
Cameron

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.