Skip to content
LOS Analyzer

Construction equipment · 2026

Various construction vehicles and trucks

Waco, TX · near Waco Rgnl (0.3 mi)

Returned to proponentDetermined - No Hazard15 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Phase 3 includes the mill and overlay of Runway 1-19 north of the Twy A4-Twy B3 intersection to include the Twy A3 intersection. The Twy C intersection will be reconstructed as shown."

Filing details

Case number (ASN)
2026-ASW-2146-NRA
Structure
Various construction vehicles and trucks
Type
Construction / vehicle
Category
Construction equipment
Height above ground
15 ft
Height above sea level
524 ft
Site elevation
509 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
May 6, 2026
Determined
August 14, 2026
Determination expires
February 14, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Waco regional Airport
Representative
KSA Engineers, Inc.

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Waco regional Airport →

Location

Coordinates
31.608453, -97.227564
Degrees / minutes / seconds
31°36'30.4"N 97°13'39.2"W
County
McLennan

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Waco Rgnl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.