Antenna tower · 2026

841765 PANGBURN

Heber Springs, AR · near Heber Springs Muni (8.8 mi)

Determination of no hazardDetermined - No Hazard260 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Adding specific frequencies. We request no change to the tower lighting originally determined under FAA Circular 1K."

Filing details

Case number (ASN)
2026-ASW-3048-OE
Structure
841765 PANGBURN
Type
Tower
Category
Antenna tower
Height above ground
260 ft
Height above sea level
806 ft
Site elevation
546 ft
Notice of
Alteration
Duration
Permanent
Marking & lighting
Dual-red and medium intensity

Timeline

Filed
February 23, 2026
Determined
March 31, 2026
Determination expires
—

Who filed it

Sponsor
Crown Castle (DK)
Representative
Crown Castle

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Crown Castle (DK) →

Location

Coordinates
35.433578, -91.888817
Degrees / minutes / seconds
35°26'00.9"N 91°53'19.7"W
County
Cleburne

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.