Skip to content
LOS Analyzer

Construction equipment · 2026

Temporary Boring Rig – Pavement Repair

Del Rio, TX · near Laughlin Afb (0.6 mi)

Returned to proponentDetermined - No Hazard28 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Temporary boring/drilling operations in support of airfield pavement repair. A mobile boring rig will be used at multiple bore locations within the project limits between Building 53 and Building 206 at Laughlin Air Force Base TX. The equipment is approximately 11.5 feet tall with boom down and up to 28 feet tall when fully extended during operation. Equipment will be mobilized and demobilized as work progresses."

Filing details

Case number (ASN)
2026-ASW-307-NRA
Structure
Temporary Boring Rig – Pavement Repair
Type
Construction / vehicle
Category
Construction equipment
Height above ground
28 ft
Height above sea level
1,100 ft
Site elevation
1,072 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 13, 2026
Determined
March 5, 2026
Determination expires
September 5, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
TLI Construction Inc
Representative
Camille Betance

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
29.360972, -100.787900
Degrees / minutes / seconds
29°21'39.5"N 100°47'16.4"W
County
Val Verde

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.