Skip to content
LOS Analyzer

Construction equipment · 2026

Taxiway Hotel Extension Phase I

Fort Worth, TX · near Perot Fld/Fort Worth Alliance (0.7 mi)

Returned to proponentDetermined - No Hazard20 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Construction of Phase I of the Taxiway Hotel Extension Project including approximately 6 500 square yards of Portland Cement Concrete pavement stabilized subbase lime-treated subgrade asphalt shoulders taxiway edge and centerline lights airfield signs airfield pavement markings and temporary and permanent erosion and sedimentation controls."

Filing details

Case number (ASN)
2026-ASW-417-NRA
Structure
Taxiway Hotel Extension Phase I
Type
Construction / vehicle
Category
Construction equipment
Height above ground
20 ft
Height above sea level
716 ft
Site elevation
696 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 27, 2026
Determined
March 10, 2026
Determination expires
September 10, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Perot Field Fort Worth Alliance Airport
Representative
Jacobs Engineering Group INC.

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Perot Field Fort Worth Alliance Airport →

Location

Coordinates
32.998528, -97.312719
Degrees / minutes / seconds
32°59'54.7"N 97°18'45.8"W
County
Denton

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Perot Fld/Fort Worth Alliance →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.