Pole lighting · 2026
B25-0627 AOA Gate 431 Construction
DFW Airport, TX · near Dallas-Fort Worth Intl (1.8 mi)
What this outcome means
The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.
The proposal, in the filer's words
"B25-0627 AOA Gate 431 Construction \nScope requires replacement of card readers / keypads installation of dual bio-readers 120v power CCTV camera on new pole and foundation infrastructure for future\nEscort Verification System and gate status lights. Provide concrete pad and new ISC / ITS cabinet with AC unit and UPS.\nSecurity to travel on wireless gateway signal by DFW\nGate to have Emergency Entrance System\nAOA fencing will be temporally relocated to allow for construction on both sides of the gate. Temporary fencing will remain throughout duration of construction. Gate\nwill be closed during construction. With the SIDA line temporally relocated all work will be performed on public side.\nBefore trenching contractor to call 811 FAA Fiber Locate Jet Fuel located ATMOS Gas locate and all other utilities.\nInfrastructure scope requires concrete saw cutting and demolition on both sides of gate. Trenching for conduit drilling of camera pole pier foundation and bollards \nrough-in conduit inspections performed backfill trenches and take densities. Form and pour drive concrete pad pole pier foundation and bollards. Camera pole placed\non pier foundation.\nConduit to be placed under concrete drive. Sch 80 shall be placed under concrete.\n(5) 1” Conduit to be roughed in under concrete. Conduit to serve:\n• Camera CAT 6A waterproof\n• Gate Controller\n• ISC power 120V 20A 1P circuit from AA Cargo ELIG14\n• A/C Unit 35AMP /2P /1P 120V Breaker from ELIG14\n• UPS System 120V 20A 1P breaker from ELIG14\n(2) 1” Conduit serving each of the duel Pedestals serving BIO readers Card Readers and Keypads\n(1) 1 ½” Conduit housing (4) CAT 6A (2) OSDP (2) 2C#16.\n(1) 1” conduit (1) 6C#18 (1) CAT 6A gate to new ISC\nTallest piece of equipment at any time during construction is 20’0”. This 20’0” is momentary while excavator is stretched out.\nCard readers CCTV camera and ISC cabinet installed and Testing.\nUpon owner acceptance of work the temporary SIDA fencing will be put back in place returning the SIDA line to its original placement.\nNo equipment material spoils or trailers will be kept at the construction site overnight."
Filing details
- Case number (ASN)
- 2026-ASW-788-NRA
- Structure
- B25-0627 AOA Gate 431 Construction
- Type
- Pole
- Category
- Pole lighting
- Height above ground
- 25 ft
- Height above sea level
- 571 ft
- Site elevation
- 546 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- February 11, 2026
- Determined
- April 8, 2026
- Determination expires
- October 8, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- DFW International Airport
- Representative
- DFW International Airport
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 32.882328, -97.013039
- Degrees / minutes / seconds
- 32°52'56.4"N 97°00'46.9"W
- County
- Dallas
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Dallas-Fort Worth Intl →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.