Skip to content
LOS Analyzer

Pole lighting · 2026

B25-0660 AOA Gate 160 161 Construction

DFW Airport, TX · near Dallas-Fort Worth Intl (1.0 mi)

Returned to proponentDetermined - No Hazard25 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"B25-0660 AOA Gate 160 161 Construction \nScope requires replacement of card readers / keypads installation of dual bio-readers 120v power CCTV camera on new pole and foundation \ninfrastructure for future Escort Verification System and gate status lights. Provide concrete pad and new ISC / ITS cabinet with AC unit and UPS.\nAll data is transmitted on existing fiber.\nBefore construction the SIDA line will be relocated temporally during construction. All construction to take place on public side.\nBefore trenching contractor to call 811 FAA Fiber Locate Jet Fuel located ATMOS Gas locate and all other utilities.\nInfrastructure scope requires concrete saw cutting and demolition on both sides of gate. Trenching for conduit drilling of camera pole pier foundation\nand bollards rough-in conduit inspections performed backfill trenches and take densities. Form and pour drive pole pier foundation and bollards.\nCamera pole placed on pier foundation. Bollards to be placed where indicated on drawings.\nAll trenching will be by hand excavation vacuum excavation when safe use a mini excavator. Pot holing by vacuum excavation only.\nSpoils removed daily.\nConduit to be installed is listed below. All conduit under drive area shall be Sch 80 PVC.\n(5) 1” Conduit serving card readers 120V power camera CAT 6A readers OSDP.\nElectrical Cabinets\n(1) ISC Cabinet with UPS and A/C\nConcrete Construction\n(1) Camera pole pier foundation 4500 PSI\nUpon completion of this work FT1 FT2 testing with contractor. FT4 testing with TS / DPS will be performed.\nUpon owner acceptance SIDA will be restored to its original condition.\nTallest piece of equipment at any time during construction is 20’0”. This 20’ covers Badger Vacuum Excavator and or traditional mini excavator. .\nThis airspace study assumes a 25’ construction ceiling.\nNo equipment material spoils or trailers will be kept at the construction site overnight."

Filing details

Case number (ASN)
2026-ASW-789-NRA
Structure
B25-0660 AOA Gate 160 161 Construction
Type
Pole
Category
Pole lighting
Height above ground
25 ft
Height above sea level
607 ft
Site elevation
582 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
February 11, 2026
Determined
April 8, 2026
Determination expires
October 8, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
DFW International Airport
Representative
DFW International Airport

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by DFW International Airport →

Location

Coordinates
32.910853, -97.041967
Degrees / minutes / seconds
32°54'39.1"N 97°02'31.1"W
County
Tarrant

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Dallas-Fort Worth Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.