Skip to content
LOS Analyzer

Crane · 2026

Mobile Construction Equipment

San Diego, CA · near San Diego Intl (0.3 mi)

Returned to proponentDetermined - No Hazard40 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"This is a Resubmittal of a previous case (2023-AWP-4425-NRA) that has expired for construction equipment. The San Diego International Airport (SDIA) is preparing for the Airport Development Plan (ADP) Airside Improvements Project. The project includes construction of the new airside taxiways and apron to support the Terminal 1 Replacement Program (T1RP). This submittal is for the temporary construction of all underground drainage and utility improvements concrete pavement sections and airfield electrical."

Filing details

Case number (ASN)
2026-AWP-1078-NRA
Structure
Mobile Construction Equipment
Type
Crane / mobile
Category
Crane
Height above ground
40 ft
Height above sea level
55 ft
Site elevation
15 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 23, 2026
Determined
July 15, 2026
Determination expires
January 15, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
San Diego County Regional Airport Authority
Representative
C & S Companies

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
32.733928, -117.194242
Degrees / minutes / seconds
32°44'02.1"N 117°11'39.3"W
County
San Diego

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near San Diego Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.