Skip to content
LOS Analyzer

Building · 2026

GO Industrial - 99th Avenue Logistics Nort

Phoenix, AZ · near Phoenix Goodyear (6.1 mi)

Determination of no hazardDetermined - No Hazard56 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Construction of a new single-story industrial warehouse/distribution facility known as 99th Avenue Logistics North. The proposed development includes approximately 1 100 500 square feet of warehouse/distribution and office space on a 75.43-acre site. The building will have a maximum parapet height of 56 feet above grade a ridge height of 50 feet and a 40-foot clear interior height. Site improvements include truck loading areas with approximately 187 dock doors trailer parking employee vehicle parking drive aisles retention facilities utility infrastructure landscaping and associated site lighting. The proposed use is industrial logistics warehousing distribution and accessory office operations."

Filing details

Case number (ASN)
2026-AWP-13092-OE
Structure
GO Industrial - 99th Avenue Logistics Nort
Type
Building
Category
Building
Height above ground
56 ft
Height above sea level
1,051 ft
Site elevation
995 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
—

Timeline

Filed
July 6, 2026
Determined
July 13, 2026
Determination expires
January 13, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Willmeng
Representative
DLR Group

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
33.432708, -112.271142
Degrees / minutes / seconds
33°25'57.7"N 112°16'16.1"W
County
Maricopa

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Phoenix Goodyear →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.