Skip to content
LOS Analyzer

Rig · 2026

Drill Rig C1

Tutuila, AS · near Pago Pago Intl (0.9 mi)

Returned to proponentDetermined - No Hazard32 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Temporary geotechnical drill rig (approximately 30 ft AGL) to be mobilized to 33 boring and coring locations along Taxiway A & C for pavement evaluation. C-17 represents the closest point to the runway centerline. See attached bore/core location plan for all 33 proposed locations."

Filing details

Case number (ASN)
2026-AWP-1499-NRA
Structure
Drill Rig C1
Type
Rig / drilling
Category
Rig
Height above ground
32 ft
Height above sea level
61 ft
Site elevation
29 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
June 1, 2026
Determined
July 30, 2026
Determination expires
January 30, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Geolabs, INC.
Representative
Jason Seidman

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Geolabs, INC. →

Location

Coordinates
-14.338036, -170.723367
Degrees / minutes / seconds
14°20'16.9"S 170°43'24.1"W
County
Western

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Pago Pago Intl →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.