Skip to content
LOS Analyzer

Crane · 2026

Crane

Mesa, AZ · near Falcon Fld (0.2 mi)

Returned to proponentDetermined - No Hazard125 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Temporary Crane used to set tank for 2.5 Hrs during daylight hours"

Filing details

Case number (ASN)
2026-AWP-252-NRA
Structure
Crane
Type
Crane
Category
Crane
Height above ground
125 ft
Height above sea level
1,508 ft
Site elevation
1,383 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
January 27, 2026
Determined
May 20, 2026
Determination expires
November 20, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
CAFS Inc
Representative
CAFS Inc

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
33.459444, -111.726111
Degrees / minutes / seconds
33°27'34.0"N 111°43'34.0"W
County
Maricopa

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Falcon Fld →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.