Building · 2026
R1 Injection Well & Backpulse Pump Stn-PT8
Reno, NV · near Reno/Stead (3.0 mi)
What this outcome means
The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.
The proposal, in the filer's words
"R1 Injection Well and Backpulse Pump Station: 10 feet.\nNew water pipelines and permanent structures will be\nconstructed at and adjacent to Reno-Stead Airport\n(RTS). As part of the American Flat Site project the\nproposed R1 injection well and backpulse pump station\nwill be constructed adjacent to RTS. Approximate\nconstruction schedule is March 2026 to May 2029."
Filing details
- Case number (ASN)
- 2026-AWP-690-OE
- Structure
- R1 Injection Well & Backpulse Pump Stn-PT8
- Type
- Building
- Category
- Building
- Height above ground
- 10 ft
- Height above sea level
- 5,108 ft
- Site elevation
- 5,098 ft
- Notice of
- New Construction
- Duration
- Permanent
- Marking & lighting
- —
Timeline
- Filed
- January 13, 2026
- Determined
- March 26, 2026
- Determination expires
- September 26, 2027
A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.
Who filed it
- Sponsor
- Truckee Meadows Water Authority
- Representative
- AECOM
Names are shown as they appear in the FAA's public record. How we handle names
Location
- Coordinates
- 39.710953, -119.881372
- Degrees / minutes / seconds
- 39°42'39.4"N 119°52'52.9"W
- County
- Washoe
- Open in a map
- Google MapsOpenStreetMap
Other filings within 5 miles
Organisation-sponsored 2026 filings whose coordinates sit near this one.
See every 2026 filing near Reno/Stead →
About this record
This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.
Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.
Screening a structure of your own?
Check Part 77 and the tower's line of sight before you file
LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.