Skip to content
LOS Analyzer

Construction equipment · 2026

Jet Blast Deflectors for OAK Twy Phase 3

Oakland, CA · near Oakland San Francisco Bay (1.0 mi)

Returned to proponentDetermined - No Hazard14 ft AGL

What this outcome means

The FAA sent the case back to the filer rather than issuing a determination. This is the most common non-clean outcome and usually means something has to change or be supplied before the study can finish — not that the project was refused.

The proposal, in the filer's words

"Deployment of temporary jet blast deflectors (JBD) for OAK Taxiway W Phase 3 Project. The deflectors will be painted and include obstruction lighting as shown on detail. Team wishes to confirm deployment of JBDs in this alignment will not interfere with ILS for Rwy 30. OE/AAA only lets us place one (1) point for temporary fixed construction equipment for study JBD line is located at (1) 37 42 24.62N 122 13 07.38W (most critical point closest to Runway 30 for filing) (2) 37 42 24.91N 122 13 07.07W and ends at (3) 37 42 25.48N 122 13 06.46W."

Filing details

Case number (ASN)
2026-AWP-961-NRA
Structure
Jet Blast Deflectors for OAK Twy Phase 3
Type
Construction / other
Category
Construction equipment
Height above ground
14 ft
Height above sea level
22 ft
Site elevation
8 ft
Notice of
New Construction
Duration
Temporary
Marking & lighting
—

Timeline

Filed
April 3, 2026
Determined
July 31, 2026
Determination expires
January 31, 2028

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Port of Oakland - OAK
Representative
Port of Oakland

Names are shown as they appear in the FAA's public record. How we handle names

Location

Coordinates
37.706839, -122.218717
Degrees / minutes / seconds
37°42'24.6"N 122°13'07.4"W
County
Alameda

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

See every 2026 filing near Oakland San Francisco Bay →

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.