Skip to content
LOS Analyzer

Wind turbine · 2026

T025a

Henryetta, OK · near Okemah Muni (7.7 mi)

Determination of no hazardDetermined - No Hazard699 ft AGL

What this outcome means

The FAA studied the proposal and concluded it would not be a hazard to air navigation. A no-hazard determination is not permanent — it carries an expiration date, and if the structure is not built by then the case has to be re-filed.

The proposal, in the filer's words

"Wind Project"

Filing details

Case number (ASN)
2026-WTW-1885-OE
Structure
T025a
Type
Windmill
Category
Wind turbine
Height above ground
699 ft
Height above sea level
1,635 ft
Site elevation
936 ft
Notice of
New Construction
Duration
Permanent
Marking & lighting
White Paint/Synchronized Red Lights

Timeline

Filed
February 5, 2026
Determined
May 12, 2026
Determination expires
November 12, 2027

A determination that lapses before the structure is built has to be re-filed. The FAA does not send a reminder.

Who filed it

Sponsor
Henryetta
Representative
RWE Clean Energy

Names are shown as they appear in the FAA's public record. How we handle names

See every 2026 filing by Henryetta →

Location

Coordinates
35.413256, -96.169636
Degrees / minutes / seconds
35°24'47.7"N 96°10'10.7"W
County
Okfuskee

Other filings within 5 miles

Organisation-sponsored 2026 filings whose coordinates sit near this one.

About this record

This page is a readable copy of a public record published by the FAA's Obstruction Evaluation / Airport Airspace Analysis system. It is not the official record and may lag it. For the authoritative case status, search this ASN at the FAA's OE/AAA portal. If something here is wrong, email support@idea-engine.studio and we will correct it.

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Screening a structure of your own?

Check Part 77 and the tower's line of sight before you file

LOS Analyzer screens a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. It is a preliminary screening — not an FAA determination and not a substitute for a licensed engineering review.