FAA obstruction filings near Kalamazoo/Battle Creek Intl

29 structures were filed with the FAA in 2026 naming Kalamazoo/Battle Creek Intl as the nearest airport. This is what people are proposing to build in its airspace, drawn from the FAA's public record.

Filings in 2026

29

Tallest proposed

270 ft

above ground level

Most recent filing

August 24, 2026

What is being filed

  • Crane14
  • Construction equipment8
  • Power line5
  • Pole lighting1
  • Antenna tower1

Where

  • MI29

Filings

Zoetis south campus crane use2026-AGL-13630-OE · Crane · 130 ft AGL · Portage, Michigan, MIAugust 24, 2026Mobile Crane2026-AGL-12811-OE · Crane · 60 ft AGL · Kalamazoo, MIAugust 10, 202617671026 - 19725-WEST CENTRE REPLACEMENT_S2026-AGL-12693-OE · Pole lighting · 43 ft AGL · Portage, MIAugust 5, 2026Staging Area Point H2026-AGL-9672-NRA · Construction equipment · 30 ft AGL · Portage, MIJune 9, 2026Staging Area Point G2026-AGL-9673-NRA · Construction equipment · 30 ft AGL · Portage, MIJune 9, 2026Staging Area Point F2026-AGL-9674-NRA · Construction equipment · 30 ft AGL · Portage, MIJune 9, 2026Staging Area Point E2026-AGL-9675-NRA · Construction equipment · 30 ft AGL · Portage, MIJune 9, 2026Mobile Crane2026-AGL-8690-OE · Crane · 60 ft AGL · Kalamazoo, MIJune 8, 2026Mobile Crane2026-AGL-8347-OE · Crane · 100 ft AGL · Kalamazoo, MIJune 1, 2026Mobile Crane2026-AGL-8348-OE · Crane · 100 ft AGL · Kalamazoo, MIJune 1, 2026Construction Area Coordinate Point A2026-AGL-7968-OE · Construction equipment · 100 ft AGL · Portage, MIMay 27, 2026Construction Area Point B2026-AGL-7969-OE · Construction equipment · 100 ft AGL · Portage, MIMay 27, 2026Construction Area Point C2026-AGL-7970-OE · Construction equipment · 100 ft AGL · Portage, MIMay 27, 2026Construction Area Point D2026-AGL-7971-OE · Construction equipment · 100 ft AGL · Portage, MIMay 27, 2026Mobile Crane2026-AGL-7287-OE · Crane · 100 ft AGL · PORTAGE, MIMay 14, 2026Mobile Crane2026-AGL-7107-OE · Crane · 100 ft AGL · Kalamazoo, MIMay 7, 2026Mobile Crane2026-AGL-6722-OE · Crane · 100 ft AGL · Portage, MIApril 30, 20261152026-AGL-6389-OE · Power line · 75 ft AGL · Portage, MIApril 23, 2026STR #1142026-AGL-6390-OE · Power line · 75 ft AGL · Portage, MIApril 23, 2026South (East) Plant Annual Crane Use2026-AGL-6169-OE · Crane · 95 ft AGL · kalamazoo, MIApril 17, 2026Mobile Crane2026-AGL-5608-OE · Crane · 100 ft AGL · Portage, MIApril 13, 2026Mobile Crane2026-AGL-5611-OE · Crane · 150 ft AGL · Portage, MIApril 13, 2026SW (West) plant crane use2026-AGL-4330-OE · Crane · 130 ft AGL · Kalamazoo, MIMarch 10, 2026North East (East) Plant Annual Crane Use2026-AGL-4331-OE · Crane · 95 ft AGL · kalamazoo, MIMarch 10, 2026Osterhout2026-AGL-2083-OE · Antenna tower · 250 ft AGL · PORTAGE, MIJanuary 29, 2026Osterhout2026-AGL-2085-OE · Crane · 270 ft AGL · PORTAGE, MIJanuary 29, 202617302026-AGL-1491-OE · Power line · 43 ft AGL · Portage, MIJanuary 19, 2026STR #2012026-AGL-1492-OE · Power line · 66 ft AGL · Portage, MIJanuary 19, 2026Cork St-Upjohn 008U5262026-AGL-1472-OE · Power line · 70 ft AGL · Portage, MIJanuary 16, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

The Docket · Week 37, 2026

RSS feed for this airport

5 new filings near Kalamazoo/Battle Creek Intl, Aug 22 – Sep 12, 2026

Structures new to the FAA's archive naming this airport as the nearest, from the snapshot published Sep 12, 2026. Tallest first. The FAA publishes a sponsor's name only once it issues a determination, so some rows are still anonymous; anonymous structures under 200 ft are counted but not listed.

This week's full docket

Email alerts

Watch the airspace around KALAMAZOO/BATTLE CREEK INTL

An email the week anything new is filed with the FAA naming this airport as the nearest: what, how tall, and who — as soon as the FAA publishes it.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.