Skip to content
LOS Analyzer

Airport · 2026 filings

FAA obstruction filings near Willow Run

56 structures were filed with the FAA in 2026 naming Willow Run as the nearest airport. This is what people are proposing to build in its airspace, drawn from the FAA's public record.

Filings in 2026

56

Tallest proposed

212 ft

above ground level

Most recent filing

August 20, 2026

What is being filed

  • Construction equipment25
  • Pole lighting14
  • Crane6
  • Power line5
  • Building3
  • Landfill3

Where

  • MI56

Most recent 50 filings

Newest first, of 56 total.

Prospect Rd Superstructure Replacement2026-AGL-13485-OE · Crane · 199 ft AGL · Ypsilanti, MIAugust 20, 2026Home2 Suites2026-AGL-13273-OE · Building · 55 ft AGL · Van Buren Township, MIAugust 18, 2026Cross St Superstructure Replacement2026-AGL-12735-OE · Construction equipment · 199 ft AGL · Ypsilanti, MIAugust 7, 20262 hotels2026-AGL-12706-OE · Building · 55 ft AGL · Van Buren Township, MIAugust 5, 2026Grove GMK5200-12026-AGL-9064-NRA · Construction equipment · 95 ft AGL · Van Buren Township, MIMay 22, 2026Crane2026-AGL-7286-OE · Crane · 180 ft AGL · Van Buren Twp, MIMay 14, 2026Landfill MC VI2026-AGL-7186-OE · Landfill · 32 ft AGL · Willow Run, MIMay 12, 2026191151-10372B2026-AGL-7055-OE · Power line · 131 ft AGL · Romulus, MIMay 7, 2026191151-10372A2026-AGL-7056-OE · Power line · 91 ft AGL · Romulus, MIMay 7, 2026191151-103722026-AGL-7057-OE · Power line · 131 ft AGL · Romulus, MIMay 7, 2026191151-10372B_CRANE2026-AGL-7058-OE · Crane · 146 ft AGL · Romulus, MIMay 7, 2026191151-10372A_CRANE2026-AGL-7059-OE · Crane · 106 ft AGL · Romulus, MIMay 7, 2026191151-10372_CRANE2026-AGL-7060-OE · Crane · 146 ft AGL · Romulus, MIMay 7, 2026L12026-AGL-8383-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L22026-AGL-8384-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L32026-AGL-8385-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L42026-AGL-8386-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L52026-AGL-8387-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L62026-AGL-8388-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L72026-AGL-8389-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L82026-AGL-8390-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L92026-AGL-8391-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L102026-AGL-8392-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L112026-AGL-8393-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L122026-AGL-8394-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L132026-AGL-8395-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026L142026-AGL-8396-NRA · Pole lighting · 35 ft AGL · Van Buren Township, MIMay 5, 2026Project Venture2026-AGL-8291-NRA · Building · 50 ft AGL · Ypsilanti, MI, MIMay 4, 2026Landfill MC VI2026-AGL-6850-OE · Landfill · 124 ft AGL · Willow Run, MIMay 1, 2026D - Airshow Ground Ops Area2026-AGL-7402-NRA · Construction equipment · 25 ft AGL · Ypsilanti, MIApril 24, 2026C - Airshow Ground Ops Area2026-AGL-7403-NRA · Construction equipment · 25 ft AGL · Ypsilanti, MIApril 24, 2026B - Airshow Ground Ops Area2026-AGL-7404-NRA · Construction equipment · 25 ft AGL · Ypsilanti, MIApril 24, 2026A - Air Show Ground Ops Area Boundary2026-AGL-7405-NRA · Construction equipment · 25 ft AGL · Ypsilanti, MIApril 24, 2026Geddes road over Sines Drain2026-AGL-5525-OE · Crane · 100 ft AGL · Wayne, MIApril 9, 2026Wayne-Zackary2026-AGL-5379-OE · Power line · 100 ft AGL · Van Buren Township, MIApril 7, 2026177476-3792026-AGL-5359-OE · Power line · 115 ft AGL · Ypsilanto, MIApril 6, 2026Landfill MC VI2026-AGL-5340-OE · Landfill · 212 ft AGL · Willow Run, MIApril 3, 2026Water Main Construction 12026-AGL-4901-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 92026-AGL-4902-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 102026-AGL-4903-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 112026-AGL-4904-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 182026-AGL-4905-NRA · Construction equipment · 35 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 172026-AGL-4906-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 162026-AGL-4907-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 152026-AGL-4908-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 142026-AGL-4909-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 132026-AGL-4910-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 122026-AGL-4911-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 32026-AGL-4912-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026Water Main Construction 42026-AGL-4913-NRA · Construction equipment · 25 ft AGL · Belleville, MIMarch 24, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch the airspace around WILLOW RUN

An email the week anything new is filed with the FAA naming this airport as the nearest: what, how tall, and who — as soon as the FAA publishes it.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.