Birmingham Airport Authority — FAA obstruction filings

Birmingham Airport Authority filed 26 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

26

Tallest proposed

25 ft

above ground level

Most recent filing

May 26, 2026

What is being filed

  • Construction equipment26

Where

  • AL26

Filings

Equipment for Temp. Sign Install/Removal2026-ASO-4235-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4238-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4239-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4240-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4241-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4242-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Equipment for Temp. Sign Install/Removal2026-ASO-4243-NRA · Construction equipment · 15 ft AGL · Birmingham, ALMay 26, 2026Truck Mounted Coring Rig2026-ASO-4151-NRA · Construction equipment · 19 ft AGL · Birmingham, ALMay 19, 2026Staging area2026-ASO-4069-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Heavy Equipment Staging2026-ASO-4070-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Haul Road2026-ASO-4071-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Excavators Dozers Trucks2026-ASO-4072-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Excavators Pavers Dozers Trucks2026-ASO-4073-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Excavators trucks directional bore2026-ASO-4074-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Trucks construction equipment2026-ASO-4075-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Trucks construction equipment2026-ASO-4076-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Trucks Construction Equipment2026-ASO-4077-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Pavers Trucks Dozers Construction Equip2026-ASO-4078-NRA · Construction equipment · 25 ft AGL · Birmingham, ALMay 15, 2026Sanitary Sewer Construction Equipment2026-ASO-3796-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 362026-ASO-3797-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 382026-ASO-3798-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 372026-ASO-3799-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 392026-ASO-3800-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 402026-ASO-3801-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Point 412026-ASO-3802-NRA · Construction equipment · 15 ft AGL · BIRMINGHAM, ALMay 7, 2026Vulcan Materials Apron Construction2026-ASO-2817-NRA · Construction equipment · 15 ft AGL · Birmingham, ALApril 9, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Birmingham Airport Authority

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.