Skip to content
LOS Analyzer

Organisation · 2026 filings

Blair Airport Authority — FAA obstruction filings

Blair Airport Authority filed 81 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

81

Tallest proposed

15 ft

above ground level

Most recent filing

February 27, 2026

What is being filed

  • Construction equipment81

Where

  • NE81

Most recent 50 filings

Newest first, of 81 total.

Blair Extension Safety and Phasing 122026-ACE-1250-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 112026-ACE-1251-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 102026-ACE-1252-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 92026-ACE-1253-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 82026-ACE-1254-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 72026-ACE-1255-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 62026-ACE-1256-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 52026-ACE-1257-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 42026-ACE-1258-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 32026-ACE-1259-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 22026-ACE-1260-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 12026-ACE-1261-NRA · Construction equipment · 15 ft AGL · Blair, NEFebruary 27, 2026Blair Extension Safety and Phasing 1122026-ACE-487-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1112026-ACE-488-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1102026-ACE-489-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1072026-ACE-492-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1062026-ACE-493-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1052026-ACE-494-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1012026-ACE-498-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 1002026-ACE-499-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 982026-ACE-501-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 962026-ACE-503-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 952026-ACE-504-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 942026-ACE-505-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 932026-ACE-506-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 922026-ACE-507-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 912026-ACE-508-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 902026-ACE-509-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 872026-ACE-512-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 862026-ACE-513-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 852026-ACE-514-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 842026-ACE-515-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 832026-ACE-516-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 822026-ACE-517-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 812026-ACE-518-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 802026-ACE-519-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 772026-ACE-522-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 762026-ACE-523-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 742026-ACE-525-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 732026-ACE-526-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 722026-ACE-527-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 712026-ACE-528-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 702026-ACE-529-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 682026-ACE-531-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 672026-ACE-532-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 662026-ACE-533-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 652026-ACE-534-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 642026-ACE-535-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 632026-ACE-536-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026Blair Extension Safety and Phasing 612026-ACE-538-NRA · Construction equipment · 15 ft AGL · Blair, NEJanuary 26, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Blair Airport Authority

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.