Skip to content
LOS Analyzer

Organisation · 2026 filings

BPA — FAA obstruction filings

BPA filed 59 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

59

Tallest proposed

215 ft

above ground level

Most recent filing

March 31, 2026

What is being filed

  • Power line59

Where

  • OR59

Most recent 50 filings

Newest first, of 59 total.

1/1 BIGE-CHEM2026-ANM-1912-OE · Power line · 165 ft AGL · Portland, ORMarch 31, 202664/1 BIGE-CHEM2026-ANM-2044-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 202663/5 BIGE-CHEM2026-ANM-2045-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 202663/4 BIGE-CHEM2026-ANM-2046-OE · Power line · 145 ft AGL · Portland, ORMarch 31, 202663/3 BIGE-CHEM2026-ANM-2047-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 202663/2 BIGE-CHEM2026-ANM-2048-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 202663/1 BIGE-CHEM2026-ANM-2049-OE · Power line · 145 ft AGL · Portland, ORMarch 31, 202662/4 BIGE-CHEM2026-ANM-2050-OE · Power line · 115 ft AGL · Portland, ORMarch 31, 202662/3 BIGE-CHEM2026-ANM-2051-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 202662/2 BIGE-CHEM2026-ANM-2052-OE · Power line · 150 ft AGL · Portland, ORMarch 31, 202662/1 BIGE-CHEM2026-ANM-2053-OE · Power line · 145 ft AGL · Portland, ORMarch 31, 202661/5 BIGE-CHEM2026-ANM-2054-OE · Power line · 176 ft AGL · Portland, ORMarch 31, 202661/4 BIGE-CHEM2026-ANM-2055-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202661/3 BIGE-CHEM2026-ANM-2056-OE · Power line · 195 ft AGL · Portland, ORMarch 31, 202661/2 BIGE-CHEM2026-ANM-2057-OE · Power line · 160 ft AGL · Portland, ORMarch 31, 202652/2 BIGE-CHEM2026-ANM-2058-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202651/6 BIGE-CHEM2026-ANM-2059-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202647/4 BIGE-CHEM2026-ANM-2060-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202647/3 BIGE-CHEM2026-ANM-2061-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202644/3 BIGE-CHEM2026-ANM-2062-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202644/2 BIGE-CHEM2026-ANM-2063-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202641/4 BIGE-CHEM2026-ANM-2064-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202640/5 BIGE-CHEM2026-ANM-2065-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202639/3 BIGE-CHEM2026-ANM-2066-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202639/2 BIGE-CHEM2026-ANM-2067-OE · Power line · 206 ft AGL · Portland, ORMarch 31, 202629/4 BIGE-CHEM2026-ANM-2068-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202627/2 BIGE-CHEM2026-ANM-2069-OE · Power line · 210 ft AGL · Portland, ORMarch 31, 202627/1 BIGE-CHEM2026-ANM-2070-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202626/4 BIGE-CHEM2026-ANM-2071-OE · Power line · 201 ft AGL · Portland, ORMarch 31, 202626/1 BIGE-CHEM2026-ANM-2072-OE · Power line · 210 ft AGL · Portland, ORMarch 31, 202625/5 BIGE-CHEM2026-ANM-2073-OE · Power line · 210 ft AGL · Portland, ORMarch 31, 202625/4 BIGE-CHEM2026-ANM-2074-OE · Power line · 210 ft AGL · Portland, ORMarch 31, 202625/3 BIGE-CHEM2026-ANM-2075-OE · Power line · 215 ft AGL · Portland, ORMarch 31, 20266/3 BIGE-CHEM2026-ANM-2076-OE · Power line · 155 ft AGL · Portland, ORMarch 31, 20266/2 BIGE-CHEM2026-ANM-2077-OE · Power line · 150 ft AGL · Portland, ORMarch 31, 20266/1 BIGE-CHEM2026-ANM-2078-OE · Power line · 160 ft AGL · Portland, ORMarch 31, 20265/4 BIGE-CHEM2026-ANM-2079-OE · Power line · 170 ft AGL · Portland, ORMarch 31, 20265/3 BIGE-CHEM2026-ANM-2080-OE · Power line · 150 ft AGL · Portland, ORMarch 31, 20265/2 BIGE-CHEM2026-ANM-2081-OE · Power line · 110 ft AGL · Portland, ORMarch 31, 20265/1 BIGE-CHEM2026-ANM-2082-OE · Power line · 155 ft AGL · Portland, ORMarch 31, 20264/4 BIGE-CHEM2026-ANM-2083-OE · Power line · 154 ft AGL · Portland, ORMarch 31, 20264/3 BIGE-CHEM2026-ANM-2084-OE · Power line · 160 ft AGL · Portland, ORMarch 31, 20264/2 BIGE-CHEM2026-ANM-2085-OE · Power line · 120 ft AGL · Portland, ORMarch 31, 20264/1 BIGE-CHEM2026-ANM-2086-OE · Power line · 115 ft AGL · Portland, ORMarch 31, 20263/6 BIGE-CHEM2026-ANM-2087-OE · Power line · 140 ft AGL · Portland, ORMarch 31, 20263/5 BIGE-CHEM2026-ANM-2088-OE · Power line · 150 ft AGL · Portland, ORMarch 31, 20263/4 BIGE-CHEM2026-ANM-2089-OE · Power line · 125 ft AGL · Portland, ORMarch 31, 20263/3 BIGE-CHEM2026-ANM-2090-OE · Power line · 165 ft AGL · Portland, ORMarch 31, 20263/2 BIGE-CHEM2026-ANM-2091-OE · Power line · 130 ft AGL · Portland, ORMarch 31, 20263/1 BIGE-CHEM2026-ANM-2092-OE · Power line · 140 ft AGL · Portland, ORMarch 31, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch BPA

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.