Skip to content
LOS Analyzer

Organisation · 2026 filings

Calista Corporation — FAA obstruction filings

Calista Corporation filed 25 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

25

Tallest proposed

32 ft

above ground level

Most recent filing

May 19, 2026

What is being filed

  • Construction equipment20
  • Building5

Where

  • AK25

Filings

Shelter Construction Buffer Corner 42026-AAL-1915-NRA · Construction equipment · 32 ft AGL · Napakiak, AKMay 19, 2026Shelter Construction Buffer Corner 32026-AAL-1916-NRA · Construction equipment · 32 ft AGL · Napakiak, AKMay 19, 2026Shelter Construction Buffer Corner 22026-AAL-1917-NRA · Construction equipment · 32 ft AGL · Napakiak, AKMay 19, 2026Shelter Construction Buffer Corner 12026-AAL-1918-NRA · Construction equipment · 32 ft AGL · Napakiak, AKMay 19, 2026Napakiak Shelter Construction2026-AAL-1919-NRA · Construction equipment · 32 ft AGL · Napakiak, AKMay 19, 2026Shelter Construction Buffer Corner 42026-AAL-1920-NRA · Construction equipment · 32 ft AGL · Kwethluk, AKMay 19, 2026Shelter Construction Buffer Corner 32026-AAL-1921-NRA · Construction equipment · 32 ft AGL · Kwethluk, AKMay 19, 2026Shelter Construction Buffer Corner 22026-AAL-1922-NRA · Construction equipment · 32 ft AGL · Kwethluk, AKMay 19, 2026Shelter Construction Buffer Corner 12026-AAL-1923-NRA · Construction equipment · 32 ft AGL · Kwethluk, AKMay 19, 2026Kwethluk Cable Shelter Construction2026-AAL-1924-NRA · Construction equipment · 32 ft AGL · Kwethluk, AKMay 19, 2026Shelter Construction Buffer Corner 42026-AAL-1925-NRA · Construction equipment · 32 ft AGL · Akiachak, AKMay 19, 2026Shelter Construction Buffer Corner 32026-AAL-1926-NRA · Construction equipment · 32 ft AGL · Akiachak, AKMay 19, 2026Shelter Construction Buffer Corner 22026-AAL-1927-NRA · Construction equipment · 32 ft AGL · Akiachak, AKMay 19, 2026Shelter Construction Buffer Corner 12026-AAL-1928-NRA · Construction equipment · 32 ft AGL · Akiachak, AKMay 19, 2026Akiachak Shelter Construction2026-AAL-1929-NRA · Construction equipment · 32 ft AGL · Akiachak, AKMay 19, 2026Shelter Construction Buffer Corner 42026-AAL-1930-NRA · Construction equipment · 32 ft AGL · Akiak, AKMay 19, 2026Shelter Construction Buffer Corner 32026-AAL-1931-NRA · Construction equipment · 32 ft AGL · Akiak, AKMay 19, 2026Shelter Construction Buffer Corner 22026-AAL-1932-NRA · Construction equipment · 32 ft AGL · Akiak, AKMay 19, 2026Shelter Construction Buffer Corner 12026-AAL-1933-NRA · Construction equipment · 32 ft AGL · Akiak, AKMay 19, 2026Akiak Shelter Construction2026-AAL-1934-NRA · Construction equipment · 32 ft AGL · Akiak, AKMay 19, 2026Napakiak Cable Landing Station Shelter2026-AAL-1891-NRA · Building · 10 ft AGL · Napakiak, AKMay 15, 2026Kwethluk Cable Landing Station Shelter2026-AAL-1790-NRA · Building · 10 ft AGL · Kwethluk, AKMay 13, 2026Akiachak Cable Landing Station Shelter2026-AAL-1792-NRA · Building · 10 ft AGL · Akiachak, AKMay 13, 2026Akiak Cable Landing Station Shelter2026-AAL-1793-NRA · Building · 10 ft AGL · Akiak, AKMay 13, 2026Napakiak Cable Landing Station Shelter2026-AAL-1794-NRA · Building · 10 ft AGL · Napakiak, AKMay 13, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Calista Corporation

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.