Skip to content
LOS Analyzer

Organisation · 2026 filings

Central Electric Power Cooperative, INC. — FAA obstruction filings

Central Electric Power Cooperative, INC. filed 78 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

78

Tallest proposed

90 ft

above ground level

Most recent filing

June 4, 2026

What is being filed

  • Power line78

Where

  • SC78

Most recent 50 filings

Newest first, of 78 total.

M-M Structure 742026-ASO-11158-OE · Power line · 81 ft AGL · Greenville, SCJune 4, 2026M-M Structure 732026-ASO-11159-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 722026-ASO-11160-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 712026-ASO-11161-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 702026-ASO-11162-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 692026-ASO-11163-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 682026-ASO-11164-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 672026-ASO-11165-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 662026-ASO-11166-OE · Power line · 84 ft AGL · Greenville, SCJune 4, 2026M-M Structure 652026-ASO-11167-OE · Power line · 84 ft AGL · Greenville, SCJune 4, 2026M-M Structure 72026-ASO-11168-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 62026-ASO-11169-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 52026-ASO-11170-OE · Power line · 68 ft AGL · Greenville, SCJune 4, 2026M-M Structure 42026-ASO-11171-OE · Power line · 68 ft AGL · Greenville, SCJune 4, 2026M-M Structure 32026-ASO-11172-OE · Power line · 68 ft AGL · Greenville, SCJune 4, 2026M-M Structure 22026-ASO-11173-OE · Power line · 68 ft AGL · Greenville, SCJune 4, 2026M-M Structure 12026-ASO-11174-OE · Power line · 71 ft AGL · Greenville, SCJune 4, 2026M-M Structure 172026-ASO-11175-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 162026-ASO-11176-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 152026-ASO-11177-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 142026-ASO-11178-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 132026-ASO-11179-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 122026-ASO-11180-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 112026-ASO-11181-OE · Power line · 65 ft AGL · Greenville, SCJune 4, 2026M-M Structure 102026-ASO-11182-OE · Power line · 65 ft AGL · Greenville, SCJune 4, 2026M-M Structure 92026-ASO-11183-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 82026-ASO-11184-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 272026-ASO-11185-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 262026-ASO-11186-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 252026-ASO-11187-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 242026-ASO-11188-OE · Power line · 70 ft AGL · Greenville, SCJune 4, 2026M-M Structure 232026-ASO-11189-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 222026-ASO-11190-OE · Power line · 88 ft AGL · Greenville, SCJune 4, 2026M-M Structure 212026-ASO-11191-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 202026-ASO-11192-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 192026-ASO-11193-OE · Power line · 86 ft AGL · Greenville, SCJune 4, 2026M-M Structure 182026-ASO-11194-OE · Power line · 76 ft AGL · Greenville, SCJune 4, 2026M-M Structure 372026-ASO-11195-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 362026-ASO-11196-OE · Power line · 84 ft AGL · Greenville, SCJune 4, 2026M-M Structure 352026-ASO-11197-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 342026-ASO-11198-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 332026-ASO-11199-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 322026-ASO-11200-OE · Power line · 85 ft AGL · Greenville, SCJune 4, 2026M-M Structure 312026-ASO-11201-OE · Power line · 85 ft AGL · Greenville, SCJune 4, 2026M-M Structure 302026-ASO-11202-OE · Power line · 75 ft AGL · Greenville, SCJune 4, 2026M-M Structure 292026-ASO-11203-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 282026-ASO-11204-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 472026-ASO-11205-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 462026-ASO-11206-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026M-M Structure 452026-ASO-11207-OE · Power line · 80 ft AGL · Greenville, SCJune 4, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Central Electric Power Cooperative, INC.

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.