Skip to content
LOS Analyzer

Organisation · 2026 filings

Chicago Executive Airport — FAA obstruction filings

Chicago Executive Airport filed 19 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

19

Tallest proposed

26 ft

above ground level

Most recent filing

May 13, 2026

What is being filed

  • Other11
  • Fence5
  • Airport development3

Where

  • IL19

Filings

Mobile Temp Stage2026-AGL-8642-NRA · Other · 26 ft AGL · Wheeling, ILMay 13, 2026Stage NE Corner2026-AGL-8643-NRA · Other · 26 ft AGL · Wheeling, ILMay 13, 2026Stage SW Corner2026-AGL-8644-NRA · Other · 26 ft AGL · Wheeling, ILMay 13, 2026Stage SE Corner2026-AGL-8645-NRA · Other · 26 ft AGL · Wheeling, ILMay 13, 2026Tent Row - NE Corner2026-AGL-8647-NRA · Other · 10 ft AGL · Wheeling, ILMay 13, 2026Tent Row NW Corner2026-AGL-8648-NRA · Other · 10 ft AGL · Wheeling, ILMay 13, 2026Tent Row SW Corner2026-AGL-8649-NRA · Other · 10 ft AGL · Wheeling, ILMay 13, 2026Tent Row SE Corner2026-AGL-8650-NRA · Other · 10 ft AGL · Wheeling, ILMay 13, 2026Runway 16342026-AGL-8555-NRA · Airport development · 10 ft AGL · Wheeling, ILMay 7, 2026Runway 12302026-AGL-8556-NRA · Airport development · 10 ft AGL · Wheeling, ILMay 7, 2026All Taxiways2026-AGL-8557-NRA · Airport development · 10 ft AGL · Wheeling, ILMay 7, 2026Tents2026-AGL-8558-NRA · Other · 10 ft AGL · Wheeling, ILMay 7, 2026Tents2026-AGL-8559-NRA · Other · 10 ft AGL · Wheeling, ILMay 7, 2026Temp Orange Fencing - Non Permanent2026-AGL-8560-NRA · Fence · 4 ft AGL · Wheeling, ILMay 7, 2026Temp Orange Fencing - Non Permanent2026-AGL-8561-NRA · Fence · 4 ft AGL · Wheeling, ILMay 7, 2026Temp Orange Fencing - Non Permanent2026-AGL-8562-NRA · Fence · 4 ft AGL · Wheeling, ILMay 7, 2026Temp Orange Fencing - Non Permanent2026-AGL-8563-NRA · Fence · 4 ft AGL · Wheeling, ILMay 7, 2026Temp Orange Fencing - Non Permanent2026-AGL-8564-NRA · Fence · 4 ft AGL · Wheeling, ILMay 7, 2026Platform Stage2026-AGL-8566-NRA · Other · 25 ft AGL · Wheeling, ILMay 7, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Chicago Executive Airport

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.