CITY OF Mitchell — FAA obstruction filings

CITY OF Mitchell filed 71 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

71

Tallest proposed

48 ft

above ground level

Most recent filing

April 26, 2026

What is being filed

  • Construction equipment67
  • Pole lighting3
  • Building1

Where

  • SD71

Most recent 50 filings

Newest first, of 71 total.

Lazy Bones-60x60x18 Blding2026-AGL-7426-NRA · Building · 29 ft AGL · Mitchell, SDApril 26, 2026Airfield Beacon Pole 12026-AGL-3399-NRA · Pole lighting · 48 ft AGL · Mitchell, SDMarch 5, 2026Airfield Beacon Pole 22026-AGL-3400-NRA · Pole lighting · 48 ft AGL · Mitchell, SDMarch 5, 2026Airfield Beacon Pole 32026-AGL-3401-NRA · Pole lighting · 48 ft AGL · Mitchell, SDMarch 5, 2026MHE (Phase 4 Work Area) - Point 762026-AGL-488-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Work Area) - Point 752026-AGL-489-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Work Area) - Point 742026-AGL-490-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Work Area) - Point 732026-AGL-491-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 722026-AGL-492-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 712026-AGL-493-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 702026-AGL-494-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 692026-AGL-495-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 682026-AGL-496-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 672026-AGL-497-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Haul Route) - Point 662026-AGL-498-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Staging Area) - Point 652026-AGL-499-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Staging Area) - Point 642026-AGL-500-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Staging Area) - Point 632026-AGL-501-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 4 Staging Area) - Point 622026-AGL-502-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Work Area) - Point 612026-AGL-503-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Work Area) - Point 602026-AGL-504-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Work Area) - Point 592026-AGL-505-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Work Area) - Point 582026-AGL-506-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Haul Route) - Point 572026-AGL-507-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Haul Route) - Point 562026-AGL-508-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 3 Haul Route) - Point 552026-AGL-509-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 422026-AGL-510-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 412026-AGL-511-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 402026-AGL-512-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 392026-AGL-513-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 382026-AGL-514-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 372026-AGL-515-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 362026-AGL-516-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 352026-AGL-517-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 342026-AGL-518-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 332026-AGL-519-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 322026-AGL-520-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 312026-AGL-521-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 302026-AGL-522-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Work Area) - Point 292026-AGL-523-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Haul Route) - Point 282026-AGL-524-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Haul Route) - Point 272026-AGL-525-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2 Haul Route) - Point 262026-AGL-526-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Haul Route) - Point 252026-AGL-527-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Haul Route) - Point 242026-AGL-528-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Haul Route) - Point 232026-AGL-529-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Staging Area) - Point 222026-AGL-530-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Staging Area) - Point 212026-AGL-531-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Staging Area) - Point 202026-AGL-532-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026MHE (Phase 2/3 Staging Area) - Point 192026-AGL-533-NRA · Construction equipment · 15 ft AGL · Mitchell, SDJanuary 19, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch CITY OF Mitchell

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.