Skip to content
LOS Analyzer

Organisation · 2026 filings

City of Wall — FAA obstruction filings

City of Wall filed 18 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

18

Tallest proposed

25 ft

above ground level

Most recent filing

March 26, 2026

What is being filed

  • Construction equipment18

Where

  • SD18

Filings

HAUL ROAD 222026-AGL-4959-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026HAUL ROAD 212026-AGL-4960-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026STAGING AREA 202026-AGL-4961-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026STAGING AREA 192026-AGL-4962-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026STAGING AREA 182026-AGL-4963-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026STAGING AREA 172026-AGL-4964-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 162026-AGL-4965-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 152026-AGL-4966-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 142026-AGL-4967-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 132026-AGL-4968-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 122026-AGL-4969-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 102026-AGL-4970-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 92026-AGL-4971-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 82026-AGL-4972-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 72026-AGL-4973-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 42026-AGL-4974-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 22026-AGL-4975-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026PROJECT LIMITS 12026-AGL-4976-NRA · Construction equipment · 25 ft AGL · Wall, SDMarch 26, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch City of Wall

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.