Skip to content
LOS Analyzer

Organisation · 2026 filings

Dominion Energy — FAA obstruction filings

Dominion Energy filed 39 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

39

Tallest proposed

187 ft

above ground level

Most recent filing

July 9, 2026

What is being filed

  • Crane23
  • Pole lighting8
  • Power line8

Where

  • VA38
  • NC1

Filings

NEW COSTCO WAREHOUSE AT 12500 JEFFERSON2026-AEA-8382-OE · Crane · 50 ft AGL · Newport News, VAJuly 9, 2026COSTCO FUEL STATION-TRANSFORMER INSTALL2026-AEA-8385-OE · Crane · 50 ft AGL · NEWPORT NEWS, VAJuly 9, 2026SC87 - WL#72026-AEA-7338-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 2026SA60 - WL#62026-AEA-7339-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 2026SA50 - WL#52026-AEA-7340-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 2026SA43 - WL#42026-AEA-7341-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 2026SA09 - WL#32026-AEA-7342-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 2026RB82 - WL#22026-AEA-7343-OE · Pole lighting · 39 ft AGL · NEWPORT NEWS, VAJune 18, 202645' Streetlight Poles for the City2026-AEA-7344-OE · Pole lighting · 45 ft AGL · NEWPORT NEWS, VAJune 18, 202645' STREETLIGHTS INSTALL2026-AEA-7345-OE · Pole lighting · 45 ft AGL · NEWPORT NEWS, VAJune 18, 2026TEMP 557/282 - Crane2026-AEA-6655-OE · Crane · 187 ft AGL · Richmond, VAMay 29, 2026TEMP 557/283 - CRANE2026-AEA-6657-OE · Crane · 186 ft AGL · Richmond, VAMay 29, 20262081/126(2150/186)2026-AEA-6566-OE · Power line · 117 ft AGL · Sterling, VAMay 26, 20262081/126(2150/186)-Crane2026-AEA-6585-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262081/127(2150/187)-Crane2026-AEA-6586-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262081/128(2451/1) Crane2026-AEA-6587-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262150/188(2447/1) Crane2026-AEA-6588-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262447/2 Crane2026-AEA-6589-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2 Crane2026-AEA-6590-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2A Crane2026-AEA-6591-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2B Crane2026-AEA-6592-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2C Crane2026-AEA-6593-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2D Crane2026-AEA-6594-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2E Crane2026-AEA-6595-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20262451/2F Crane2026-AEA-6596-OE · Crane · 150 ft AGL · Sterling, VAMay 26, 20265001/412026-AEA-6510-OE · Power line · 180 ft AGL · Fairfax, VAMay 21, 2026271/702026-AEA-5686-OE · Power line · 115 ft AGL · Virginia Beach, VAApril 28, 2026271/692026-AEA-5687-OE · Power line · 166 ft AGL · Virginia Beach, VAApril 28, 2026271/682026-AEA-5688-OE · Power line · 130 ft AGL · Virginia Beach, VAApril 28, 2026271/672026-AEA-5689-OE · Power line · 135 ft AGL · Virginia Beach, VAApril 28, 2026271/662026-AEA-5690-OE · Power line · 140 ft AGL · Virginia Beach, VAApril 28, 20262031/23A (2188/26A) Crane2026-AEA-5218-OE · Crane · 147 ft AGL · Dulles, VAApril 14, 20262415/1A Crane2026-AEA-5219-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262415/1B Crane2026-AEA-5220-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262415/1C Crane2026-AEA-5221-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262415/1D Crane2026-AEA-5223-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262415/1E Crane2026-AEA-5225-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262415/1 Crane2026-AEA-5226-OE · Crane · 112 ft AGL · Dulles, VAApril 14, 20262073/282026-ASO-5250-OE · Power line · 88 ft AGL · Elizabeth City, NCMarch 9, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch Dominion Energy

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.