Skip to content
LOS Analyzer

Organisation · 2026 filings

DONA ANA County — FAA obstruction filings

DONA ANA County filed 29 FAA notices of proposed construction in 2026. Every one is a public record; this page collects them in one place.

Filings in 2026

29

Tallest proposed

25 ft

above ground level

Most recent filing

April 25, 2026

What is being filed

  • Construction equipment29

Where

  • NM29

Filings

Stockpile Area pt 92026-ASW-1975-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Stockpile Area pt 82026-ASW-1976-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Stockpile Area pt 72026-ASW-1977-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Stockpile Area pt 62026-ASW-1978-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Storage and Staging Area pt 132026-ASW-1980-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Storage and Staging Area pt 122026-ASW-1981-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Storage and Staging Area pt 112026-ASW-1982-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Storage and Staging Area pt 102026-ASW-1983-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Access Route pt 172026-ASW-1985-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Access Route pt 162026-ASW-1986-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Access Route pt 152026-ASW-1987-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Access Route pt 142026-ASW-1988-NRA · Construction equipment · 15 ft AGL · Santa Teresa, NMApril 25, 2026Phase 12026-ASW-1121-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 12026-ASW-1122-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 22026-ASW-1123-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 32026-ASW-1124-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 42026-ASW-1125-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 162026-ASW-1129-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 152026-ASW-1130-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 142026-ASW-1131-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 132026-ASW-1132-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 7, 2026WORK AREA PT 52026-ASW-1079-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 62026-ASW-1080-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 72026-ASW-1081-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 82026-ASW-1082-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 92026-ASW-1083-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 102026-ASW-1084-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 122026-ASW-1085-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026WORK AREA PT 112026-ASW-1086-NRA · Construction equipment · 25 ft AGL · Santa Teresa, NMMarch 6, 2026

Source: FAA Obstruction Evaluation / Airport Airspace Analysis (OE/AAA) public archive (oeaaa.faa.gov), data as of September 12, 2026. Compiled by LOS Analyzer (Idea Engine LLC). This is not an official FAA record or an FAA determination; the FAA's portal is authoritative. LOS Analyzer is not affiliated with or endorsed by the FAA.

Email alerts

Watch DONA ANA County

An email the week the FAA publishes a new filing or determination for this organisation, plus a warning when one of its no-hazard determinations is within 90 days of expiring.

Double opt-in: we send one confirmation link and nothing until you click it. One email a week at most, unsubscribe in every message.Privacy Policy

Planning something here?

Screen it against Part 77 before you file

LOS Analyzer checks a proposed structure against FAA Part 77 surfaces and the control tower's sightline to the runway, terrain-aware, in minutes. Preliminary screening only — not an FAA determination, and not a substitute for a licensed engineering review.